(1)
Pengembangan Algoritma Penjadwalan Preventive Maintenance Dengan Menggunakan Metoda Nippon-Denso Dan Analytic Hierarchy Process Di PT. Pupuk Kujang I B. JT 2020, 8 (1), 1-14. https://doi.org/10.26874/jt.vol8no1.298.