A Review: Reliability Assessment of Isolated Phase Busduct Through FMEA and RCFA Methodologies

Penulis

  • Handoko Rusiana Iskandar Teknik Elektro Universitas Jenderal Achmad Yani
  • Ahmad Daelami Universitas Jenderal Acmad Yani
  • Awang Rahmawan Prakoso Universitas Jenderal Acmad Yani
  • Cepi Arifin Universitas Jenderal Acmad Yani
  • Miftah Farid Universitas Jenderal Acmad Yani

DOI:

https://doi.org/10.55893/jt.vol24no1.737

Kata Kunci:

Failure Mode and Effect Analysis, Isolated Phase Busduct, Risk Priority Number

Abstrak

Penelitian ini mendiskusikan kehandalan Isolated Phase Busduct (IPB) unit pembangkit panasbumi masih perlu ditingkatkan karena gangguan-gangguan yang sama masih terjadi, dimana pada periode tahun 2018-2023 gangguan tersebut telah menyumbangkan Loss Production Opportunity sekitar 65 Miliar Rupiah. Oleh karena itu penelitian ini akan memberikan usulan atau saran faktor apa saja yang perlu ditingkatkan agar kehandalan IPB disetiap unit pembangkit listrik panasbumi meningkat. Adapun metode yang digunakan dalam penelitian ini adalah Failure Mode And Effect Analysis (FMEA) dan metode Root Cause Failure Analysis (RCFA), dimana FMEA membantu dalam mengidentifikasi potensi kegagalan dan menentukan prioritas mitigasi dan menentukan nilai Risk Priority Number (RPN), Root Cause Failure Analysis (RCFA) mengungkap penyebab utama kegagalan yang telah terjadi, dari kedua metode tersebut diketahui bahwa gangguan yang terjadi sebenarnya dapat diidentifikasi lebih dini sebesar 91,2% serta faktor seperti manufacture design, aging equipment, unproper installation, Lack Quality Control, dan unproper mobilisation harus dieliminasi dalam upaya meningkatkan kehandalan IPB dimana faktor-faktor tersebut harus diperhatikan dari mulai fase proyek sampai dengan fase operasional.

Biografi Penulis

  • Ahmad Daelami, Universitas Jenderal Acmad Yani

    Departemen Teknik Elektro

  • Awang Rahmawan Prakoso, Universitas Jenderal Acmad Yani

    Departemen Teknik Elektro

  • Cepi Arifin, Universitas Jenderal Acmad Yani

    Departemen Teknik Elektro

  • Miftah Farid, Universitas Jenderal Acmad Yani

    Departemen Teknik Elektro

Referensi

Al Marzooqi, F. A., Hussain, M., & Ahmad, S. Z. (2019). Performance of physical asset management using the analytic hierarchy process. Property Management, 37(3), 327–345. https://doi.org/10.1108/PM-07-2018-0039

Alsyouf, I., Alsuwaidi, M., Hamdan, S., & Shamsuzzaman, M. (2021). Impact of ISO 55000 on organisational performance: evidence from certified UAE firms. Total Quality Management and Business Excellence, 32(1–2), 134–152. https://doi.org/10.1080/14783363.2018.1537750

Dolin, A. P. (2020). Diagnostic Examination of Isolated Bus Ducts. Power Technology and Engineering, 54(3), 444–449. https://doi.org/10.1007/S10749-020-01230-X/METRICS

Eyuboglu, O. H., Dindar, B., & Gul, O. (2020). Risk Assessment by Using Failure Modes and Effects Analysis (FMEA) Based on Power Transformer Aging for Maintenance and Replacement Decision. Proceedings - 2020 IEEE 2nd Global Power, Energy and Communication Conference, GPECOM 2020, 251–255. https://doi.org/10.1109/GPECOM49333.2020.9247887

Fu, J., Yang, B., Wang, X., Feng, A., Cai, F., & Zhang, H. (2024). Mechanism Analysis of Insulator Fault in Enclosed Isolated Phase Bus Caused by Vibration. The Proceedings of 2023 4th International Symposium on Insulation and Discharge Computation for Power Equipment (IDCOMPU2023), 1101, 349–355. https://doi.org/10.1007/978-981-99-7401-6_34

Hajiagha, S. H. R., Hashemi, S. S., Mohammadi, Y., & Zavadskas, E. K. (2016). Fuzzy belief structure based VIKOR method: An application for ranking delay causes of Tehran metro system by FMEA criteria. Transport, 31(1), 108–118. https://doi.org/10.3846/16484142.2016.1133454

Hatala, M. H., Sukarsono, B. P., & Nukertamanda, D. (2023). Risk and Reliability Improvement Analysis of Boiler System Using the Failure Mode Effect Analysis & Critical Analysis (FMECA) Method. Spektrum Industri, 21(1), 8. https://doi.org/10.12928/SI.V21I1.98

Kamble, S. N., & Rajiv, B. (2022). Critical Analysis of Machine Condition Monitoring by Using Risk Priority Number and Analytical Hierarchy Process. Journal of Failure Analysis and Prevention, 22(2), 623–632. https://doi.org/10.1007/S11668-022-01350-8/METRICS

Kim, K. O., & Zuo, M. J. (2018). Optimal allocation of reliability improvement target based on the failure risk and improvement cost. Reliability Engineering & System Safety, 180, 104–110. https://doi.org/10.1016/j.ress.2018.06.024

Li, Y., Sun, P., Li, H., Qu, L., Gong, J., & Huang, S. (2024). Coordinated Control of Intentional Islanding and Phase Sequence Exchange for Enhancing Transient Stability of Isolated Power Grid. IEEE Transactions on Industrial Electronics, 71(5), 5205–5214. https://doi.org/10.1109/TIE.2023.3285993

Lu, P., Powrie, H. E., Wood, R. J. K., Harvey, T. J., & Harris, N. R. (2021). Early wear detection and its significance for condition monitoring. Tribology International, 159, 106946. https://doi.org/10.1016/j.triboint.2021.106946

Maletic, D., Maletic, M., Al-Najjar, B., & Gomiscek, B. (2020). An Analysis of Physical Asset Management Core Practices and Their Influence on Operational Performance. Sustainability 2020, Vol. 12, Page 9097, 12(21), 9097. https://doi.org/10.3390/SU12219097

Mzougui, I., & El Felsoufi, Z. (2019). Proposition of a modified FMEA to improve reliability of product. Procedia CIRP, 84, 1003–1009. https://doi.org/10.1016/j.procir.2019.04.315

Patil, S. S., & Bewoor, A. K. (2021). Reliability analysis of a steam boiler system by expert judgment method and best-fit failure model method: a new approach. International Journal of Quality and Reliability Management, 38(1), 389–409. https://doi.org/10.1108/IJQRM-01-2020-0023

Patil, S. S., Bewoor, A. K., & Patil, R. B. (2021). Availability analysis of a steam boiler in textile process industries using failure and repair data: A case study. ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part B: Mechanical Engineering, 7(2). https://doi.org/10.1115/1.4049007

Patil, S. S., Bewoor, A. K., Patil, R. B., Kumar, R., Ongar, B., Sarsenbayev, Y., PraveenKumar, S., Ibrahim, A. M. M., Alsoufi, M. S., & Elsheikh, A. (2022). A New Approach for Failure Modes, Effects, and Criticality Analysis Using ExJ-PSI Model—A Case Study on Boiler System. Applied Sciences 2022, 12(22), 11419. https://doi.org/10.3390/APP122211419

Petrescu, L., Petrescu, M. C., Cazacu, E., & Ionita, V. (2021). Risk Priority Number vs Action Priority in Electrical Systems. 12th International Symposium on Advanced Topics in Electrical Engineering, ATEE 2021, 1–6. https://doi.org/10.1109/ATEE52255.2021.9425178

Sheng, F. L., Thin Wei, C., Teng, T. L., & Chik Hooi, L. (2023). Recovered Scan Failure Investigation and Failure Mechanism Determination. Proceedings of the International Symposium on the Physical and Failure Analysis of Integrated Circuits, IPFA, 2023-July, 1–6. https://doi.org/10.1109/IPFA58228.2023.10249095

Siva Sathyanarayana, M., & Amarnath, J. (2012). Modelling and Analysis of Trajectories of A Wire Like Particle in A Three Phase Common Enclosure Gas Insulated Busduct (GIB) With Image Charges. International Journal of Engineering and Advanced Technology (IJEAT), 1(5), 2249–8958. www.ijeat.org

Wang, H., Zhao, Z., Dai, Z., Peng, Z., & Li, S. (2021). Using Data Mining and Root Cause Analysis Method for Failure Analysis in Electronic Components. IOP Conference Series: Materials Science and Engineering, 1043(2), 1–9. https://doi.org/10.1088/1757-899X/1043/2/022024

File Tambahan

Diterbitkan

2025-06-02

Cara Mengutip

A Review: Reliability Assessment of Isolated Phase Busduct Through FMEA and RCFA Methodologies. (2025). Jurnal Teknik: Media Pengembangan Ilmu Dan Aplikasi Teknik, 24(1), 84-93. https://doi.org/10.55893/jt.vol24no1.737

Artikel Serupa

1-10 dari 92

Anda juga bisa Mulai pencarian similarity tingkat lanjut untuk artikel ini.